The Roswell campus · Chaves County, New Mexico

Firm power, around the clock.

About 8,500 acres of approved ranchland south of Roswell. Solar by day, batteries through the night, and fuel cells in reserve, off the grid.

CONCEPT VISUALS

Phase 1

Ten megawatts of net power, around the clock.

Because the sun shines only part of the day, it takes 90 megawatts of solar and 258 megawatt-hours of batteries to deliver 10 megawatts every hour of every day. Solid-oxide fuel cells stand in reserve.

90MWdcSolar on 320 acres
258MWhBattery storage
10MWNet power, 24/7
2027Target for first power, October

How it grows

Phase by phase, on the same playbook.

Phase 1 · 10 MW netSolar, batteries and fuel-cell reserve on 320 acres.
Phase 2 · 45 MW netAdds 35 MW net on the same design.
Later phasesEach returns to the county for development-plan review.
End of lifeDecommissioning plan and bond; the land returns to agriculture.

Agrivoltaics

Ranchland that keeps working.

The panels ride on steel posts nine feet and up, half panel and half open sky, so the cattle keep grazing underneath. Japan calls it solar sharing.

  • Studies show cattle under panels drink 14 to 20 percent less water.
  • Shade grows higher-protein grass.
  • Cattle keep grazing as we build.
GRAZING UNDER THE PANELS · CONCEPT

Water

No water to cool.

A sealed glycol loop with dry coolers carries the heat away. No evaporative towers, no aquifer draw for cooling. The water stays with the families and the ranches.

DRY COOLERS · CONCEPT

Reserve power

Fuel cells standing by.

Solid-oxide fuel cells make power electrochemically, combustion-free, and stand in reserve behind the solar and batteries. Our own FC-40 fuel cell is in development for the campus.

FUEL-CELL RESERVE · CONCEPT

Questions

Frequently asked.

How does the campus make power?

Solar panels make power during the day and charge batteries. The batteries carry the load through the night. Solid-oxide fuel cells stand in reserve. Phase 1 is designed to deliver 10 megawatts every hour of every day.

Is it connected to the utility grid?

No. The campus is designed to run off the grid, so it does not wait in a utility's connection line or add load to local ratepayers.

Does it use water?

Not for cooling. A sealed glycol loop with dry coolers carries the heat away, with no cooling towers and no aquifer draw for cooling.

Where is it, and what happens to the ranch?

South of Roswell in Chaves County, New Mexico, on about 8,500 acres of working ranchland. The panels sit on posts nine feet and up, so cattle keep grazing underneath.

Who will buy the power?

Our planned first customer is our own company, Zenith Volts Manufacturing. The rest goes to large users that need firm power without waiting for the grid, such as manufacturing, heavy industry, agriculture and food processing.

When will it run?

The target for first power is October 2027. Phase 2 adds 35 megawatts, for 45 megawatts of net power in all. These are targets, not results.