Zenith Volts · Chaves County, New Mexico

Power for America, built here.

Zenith Volts is building independent power for American industry, and the American-made equipment behind it: solar by day, batteries through the night, fuel cells in reserve. Off the grid, on working ranchland, with no water used for cooling.

CONCEPT VISUALSSCROLL

Why now

America needs more power than its grid can deliver.

Factories, industry and farms all wait years in line for a utility connection. Zenith skips the line. We build our own power on ranchland we control, and we build the equipment ourselves, so the jobs stay where the power is made.

10MWPhase 1 net power, around the clock
45MWNet power after Phase 2
8,500acresSite under option, south of Roswell
ZeroGallons of water used for cooling

What is already in place

Approved. Signed. Moving to notice to proceed.

  • Chaves County approved Special Use Permit Z 2025-04 on August 4, 2025. It covers solar, storage and a data center. Phase 1 sells power to industry.
  • A signed land option covers the whole site, and cattle keep grazing.
  • A ten-year manufacturing and workforce agreement with the Roswell-Chaves County Economic Development Corporation, signed July 8, 2026. What it commits us to →
  • High-capacity fiber service under contract for the campus.
  • Eleven provisional patent applications filed on our own designs.
  • OE Solar selected as design-build contractor.
WORKING RANCHLAND · CONCEPT

From vision to execution

Where the Roswell Campus stands.

Every step is marked as it really is: done, underway, or planned.

  1. County permitDONESpecial Use Permit Z 2025-04 approved August 4, 2025.
  2. Economic Development agreementDONETen-year manufacturing and workforce agreement, signed July 8, 2026.
  3. Land controlDONESigned option on the whole site.
  4. Fiber and contractorDONEFiber service under contract; OE Solar selected as design-build contractor.
  5. Engineering and financingUNDERWAYDesign, equipment and capital for Phase 1.
  6. Notice to proceedNEXTConstruction starts once financing closes.
  7. First powerTARGET · OCTOBER 2027Phase 1: 10 MW net, around the clock.

The Zenith Volts group

One group. Power, the equipment, and the builders.

CONCEPT
PARENT · WYOMING

Zenith Volts Corporation

Will own and operate the power plants, starting with the Roswell campus.

The Roswell campus →
CONCEPT
SUBSIDIARY · WYOMING

Zenith Volts Manufacturing

Plans to build fuel cells, batteries and power equipment in Hagerman, New Mexico.

▶ Watch the filmManufacturing →
CONCEPT
SUBSIDIARY · NEW MEXICO

Zenith Volts Infrastructure

Will build and service power sites, for Zenith and for outside clients.

▶ Watch the filmInfrastructure →
CONCEPT
SUBSIDIARY · WYOMING

Tranquillity Clean Energy Park

A planned clean energy park in Fresno County, California, with solar, storage and biogas fuel cells.

▶ Watch the filmTranquillity →
CONCEPT
SUBSIDIARY · WYOMING

Aeterna Concrete

The group's concrete company. Aeterna acquires established concrete producers and grows them.

▶ Watch the filmAeterna Concrete →
NPK 75 film title: Minerals back in the soilFILM
DISTRIBUTION · UNITED STATES

NPK 75

Zenith Volts is a distributor of NPK 75 in the United States, through mixing hubs planned at Aeterna concrete plants.

▶ Watch the filmNPK 75 and the film →
CONCEPT
GROUP COMPANY · JAPAN

KIZUNA Corporation

A Zenith Volts Corporation group company in Japan, based in Tokyo. Kizuna plans to connect the group with Japanese finance and suppliers.

Visit the Kizuna site ↗

Films

See each company in a few minutes.

ZENITH VOLTS MANUFACTURING

Made in Chaves County

Fuel cells, batteries and transformers, planned for Hagerman, New Mexico.

AETERNA CONCRETE

Built to Last

Buying established concrete producers and growing them.

ZENITH VOLTS INFRASTRUCTURE

We build power sites

Power first: solar, storage and fuel cells built on site, from bare ground to steady power.

TRANQUILLITY CLEAN ENERGY PARK

Farm power for the valley

A weed California pays to remove becomes power and soil, on farmland that keeps working.

NPK 75 · DISTRIBUTION

Minerals back in the soil

A natural liquid concentrate with 75 trace minerals, distributed in the United States by Zenith Volts.

Made in Chaves County

A target of 1,200 to 2,100 permanent jobs, built with local hands.

Who buys the power

Firm power for anyone who can't wait.

Our planned first power customer is our own company, Zenith Volts Manufacturing. Every other megawatt goes to large users that need firm power without waiting for the grid.

  • Manufacturing and heavy industry
  • Agriculture and food processing
  • Remote sites through the Zenith Power Pod, in development
BATTERY YARD · CONCEPT